Monday, September 29, 2014

Monday Monday

A full week of sunshine is forecast, Mullet and I packed up for a productive  week and headed to Deale. 

I planned to apply Smiths CPES penetrating epoxy to all of the old and new wood for the aft cabin, but it was drizzling on and off all day. 

I cut and fitted the plywood repair to the deck at the Sampson post and the plywood pieces for the aft edge of the aft cabin. Then I worked on the cockpit aft bench. I removed a section of the bench top 10" x 18", and found some rot underneath on the deck beam and bulkhead as well. Not what I wanted to find, but it looks pretty isolated. More excavation tomorrow. 



Dinner at Happy Harbor and an early night. Hope it's dry tomorrow!

No comments:

Post a Comment